page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
page 186
page 187
page 188
page 189
page 190
page 191
page 192
page 193
page 194
page 195
page 196
page 197
page 198
page 199
page 200
page 201
page 202
page 203
page 204
page 205
page 206
page 207
page 208
page 209
page 210
page 211
page 212

Bakor 790- 11 Tarmac Road or Car Park Hot Rolled Tarmacadam asphalt road or pathway surface Bauder AP3 Protection Sheet is loose- laid to deliver a robust surface onto which the tarmacadam is installed. Bauder API Access Protection Sheet to suit the proposed landscaping, fully bonded into the Bakor 790- II. Bakor 790- II, second 3 mm layer bleeds through the reinforcement to create a 6 mm monolithic waterproofing membrane. Bauder Polyester Reinforcement strengthens the system, providing a uniform surface to apply the second layer of hot melt. Bakor 790- II, first 3 mm layer infills and fully bonds to all minor deviations and the deck. Bauder Polymer Primer dries in minutes, promoting nearly a 50% increase in bond strength compared to a normal primer. bauder. ie BAUDER BAKOR HOT MELT Bauder Bakor is applied in two 3 mm layers sandwiching a reinforcement layer to create one monolithic layer with no laps. It will infill minor cracks and deviation in the Bakor 790- 11 Hot Melt Inverted System with Paving suitable for plazas and teraces Paving on Supports, suitable for a roof terrace. Bauder U- Max, vapour permeable membrane designed to increase the thermal capacity of the insulation. Bauder XPS Insulation at a thickness to suit the U- value required. Bauder API Access Protection Sheet to suit the proposed landscaping, fully bonded into the Bakor 790- II. Bakor 790- II, second 3 mm layer bleeds through the reinforcement to create a 6 mm monolithic waterproofing membrane. Bauder Polyester Reinforcement strengthens the system, providing a uniform surface to apply the second layer of hot melt. Bakor 790- II, first 3 mm layer infills and fully bonds to all minor deviations and the deck. Bauder Polymer Primer dries in minutes, promoting nearly a 50% increase in Bakor 790- 11 Hot Melt Intensive Green Roof System Bauder Intensive Substrate ( with turf). The substrate is a lightweight growing material which features 25% organic material. Bauder Filter Fleece is a filtration layer that prevents substrate fines from washing into the drainage or water storage layer. DSE 60 is a water storage and drainage layer, 60 mm thick. Bauder Root Barrier AP2 to suit the proposed landscaping, fully bonded into the Bakor 790- II. This protection layer is root resistant and complies with FFL guidelines. Bakor 790- II, second 3 mm layer bleeds through the reinforcement to create a 6 mm monolithic waterproofing membrane. Bauder Polyester Reinforcement strengthens the system, providing a uniform surface to apply the second layer of hot melt. Bakor 790- II, first 3 mm layer infills and fully bonds to all minor deviations and the deck. Bauder Polymer Primer dries in minutes, promoting nearly a 50% increase in bond strength compared to a normal primer. deck to form a 100% bond, eliminating the possibility of water being able to track beneath in the event of damage. 72

73 bauder. co. uk PROJECT FOCUS Lower Broughton Manchester Lower Broughton Manchester ? Leaky pipe irrigation system ? Quick drying polymer primer ? Bauder PLT 60 and Mineral Drain ? Substrate prior to turf ? FLL root resistant protection layer ? 709- 11 hot melt beign installed STRUCTURAL WATERPROOFING