page 1 page 2 page 3 page 4 page 5 page 6 page 7 page 8 page 9 page 10 page 11 page 12 page 13 page 14 page 15 page 16 page 17 page 18 page 19 page 20 page 21 page 22 page 23 page 24 page 25 page 26 page 27 page 28 page 29 page 30 page 31 page 32 page 33 page 34 page 35 page 36 page 37 page 38 page 39 page 40 page 41 page 42 page 43 page 44 page 45 page 46 page 47 page 48 page 49 page 50 page 51 page 52 page 53 page 54 page 55 page 56 page 57 page 58 page 59 page 60 page 61 page 62 page 63 page 64 page 65 page 66 page 67 page 68 page 69 page 70 page 71 page 72 page 73 page 74 page 75 page 76 page 77 page 78 page 79 page 80 page 81 page 82 page 83 page 84 page 85 page 86 page 87 page 88 page 89 page 90 page 91 page 92 page 93 page 94 page 95 page 96 page 97 page 98 page 99 page 100 page 101 page 102 page 103 page 104 page 105 page 106 page 107 page 108 page 109 page 110 page 111 page 112 page 113 page 114 page 115 page 116 page 117 page 118 page 119 page 120 page 121 page 122 page 123 page 124 page 125 page 126 page 127 page 128 page 129 page 130 page 131 page 132 page 133 page 134 page 135 page 136 page 137 page 138 page 139 page 140 page 141 page 142 page 143 page 144 page 145 page 146 page 147 page 148 page 149 page 150 page 151 page 152 page 153 page 154 page 155 page 156 page 157 page 158 page 159 page 160 page 161 page 162 page 163 page 164 page 165 page 166 page 167 page 168 page 169 page 170 page 171 page 172 page 173 page 174 page 175 page 176 page 177 page 178 page 179 page 180 page 181 page 182 page 183 page 184 page 185 page 186 page 187 page 188 page 189 page 190 page 191 page 192 page 193 page 194 page 195 page 196 page 197 page 198 page 199 page 200 page 201 page 202 page 203 page 204 page 205 page 206 page 207 page 208 page 209 page 210 page 211 page 212
|
Welted Drips This traditional method of terminating the membranes at the roof edge, whether at a kerb or external gutter, remains a favourite. These can be with or without a hardboard or plywood former, depending on the preference of the installer ( although a former must be used for System Airtech). The method of creating a welted drip is detailed in Codes of Practice BS8217: 2005 and shown on many Bauder detail drawings. GRP Edge Trims A more aesthetically pleasing alternative to a welted drip at the edge kerb is a GRP trim. Bauder can supply these in black, white or grey as standard. We advise against the use of metal trims ( particularly aluminium) as these have been a common cause of problems in past years - their high rate of expansion and contraction causing splits to traditional felt membranes and asphalt on the top of the kerb directly above trim joints. Timber Protection Plates These are to be provided against the exposed edges of insulation to prevent mechanical damage ( gutter edges, drip edges etc.). The use of a batten or timber plate will depend upon the actual situation. A 150 mm timber plate should be used where water drains off or over the detail and the thickness of the waterproofing build- up must be accommodated to avoid the creation of a water check. The plate must be at least 15 mm less than the thickness of the insulation. 37 bauder. co. uk DETAILING APPLICATION GENERAL DETAILING Vapour Barrier / Underlayer Seal At all perimeters and details it is extremely important that the vapour barrier is taken up the detail to lap with the underlayer by a minimum 100 mm. This applies to all Bauder RBM systems, and is important to is give security to the system during high winds. This practicealso ensures that any water penetrating system will not contaminate the insulation as it is totally encapsulated. Protection at System Termination Protection must be provided at all vulnerable edges of the system to prevent water ingress behind. This may be a metal coverflashing or a cladding system in the case of an upstand to a wall, or a welded collar around a plant support leg. Bauder will provide a range of standard drawings showing preferred solutions to common problems on request. Angle Fillets At all 90° internal bends, at horizontal / vertical interfaces, Bauder angle fillets must be provided above the insulation, in order to soften the angle and make it easier to seal where the membrane laps occur at the interface. In a cold roof design, timber fillets should be used prior to installing the waterproofing membranes. Small protrusions through the roof need not have angle fillets installed around them, but extra care must be taken by the installer to achieve a good seal. Separate Flashings The capping sheet should never be taken across the roof and up a detail in one piece. The polyester within the capping sheet may shrink over time causing ripples and de- bonding of the membrane. All Bauder details show separate capping sheet flashings to counteract this. Insulation 150 mm treated timber plate - 15 mm less thickness than the insulation board TECHNICAL GUIDE The vapour barrier is dressed up the wall a minimum 400 mm. The Bauder Insulation Upstand Support Bracket is fixed to the wall using suitable fixings with its top edge a minimum 300 mm above the deck. 30 mm thick insulation is applied to the upstand, held in place by the support bracket. The insulation is applied to the flat area of the roof, and the underlayer taken over the bracket to lap with the vapour barrier by 100 mm. The capsheet is applied, with a separate flashing to the upstand. 38 bauder. ie ANCILLARY PRODUCTS ADDITIONAL BAUDER PRODUCTS Bauder R333 Taping Strip Bauder R333 taping strip is used to tape over the joints in certain types of decking ( plywood, woodwool slabs, etc.) before laying the vapour barrier ( or underlayer in the case of a cold roof). The purpose of this product is to take up any movement between adjacent structural panels, whilst also preventing molten bitumen from running through the joints. It can be held in place with staples, dabs of bitumen, bitumen adhesive or self- adhesive tape. Bauder TA600 This product is a polyester based membrane used as a sacrificial random nailed layer for application of Bauder RBM systems to timber boarded decks ( close butted or T& G). The material should be random nailed ( using large headed galvanised clout nails) at 200 mm centres, with 50 mm stagger nailing to all perimeters, head and side laps, prior to installing the next layer which should be fully bonded. Bauder TA600 Random Nailing Pattern 200 mm centres in field area 50 mm stagger nailed at perimeters and laps Insulated Upstand Support Brackets Part L of the Building Regulations for England and Wales requires all perimeters and details of a flat roof system to be designed and created in such a way that thermal bridging is reduced, and heat loss consequently minimised, in order to help reduce carbon dioxide emissions. This regulation applies to both New Build and Refurbishment work and reference is made to ' Accredited Construction Details' design guidance. This document shows that all buildings with warm roofs and insulated walls should have insulation applied to the inside face of the wall at roof level to a minimum height of 300 mm above the deck. This is to reduce cold bridging through the inner skin of brickwork. In order to make this detail both technically and simply achievable, Bauder have developed a unique support bracket for use with our bitumen systems. The installation sequence is shown in the series of pictures below. |